POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

New Hill 1 Battery / NHBA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)56 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1d13f2d2043d72b9b4564132
Net Summer Capacity (MW)56 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1d13f2d2043d72b9b4564132
Net Winter Capacity (MW)56 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1d13f2d2043d72b9b4564132
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID69119
Plant NameNew Hill 1 Battery
Google MapMap
Bing MapMap
Plant StateNC
CountyWake
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDNHBA1
Nameplate Capacity (MW)56
Net Summer Capacity (MW)56
Net Winter Capacity (MW)56
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude35.659692
Longitude-78.94412
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1024

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1661

Sources EV-891d1be4550e6ea20227fc8e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a3143e7b8f9853faed72918a1b8666868462b1e44ce3fcc7489166bbb3de1d38

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1024

Sources EV-1d13f2d2043d72b9b4564132
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 204198026d2231df8b562d2b59373c1959a78f793bd3dbf9a640c723d7114871

Usage terms US government public domain

Source snapshots by date · USA · eia860

New Hill 1 Battery / NHBA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code69119
Plant NameNew Hill 1 Battery
StateNC
CountyWake
Generator IDNHBA1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)56
Summer Capacity (MW)56
Winter Capacity (MW)56
StatusU
Effective Month9
Effective Year2027
Current Month9
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1661

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1661

Sources EV-891d1be4550e6ea20227fc8e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a3143e7b8f9853faed72918a1b8666868462b1e44ce3fcc7489166bbb3de1d38

Usage terms US government public domain

Source snapshots by date · USA · eia860m

New Hill 1 Battery / NHBA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID69119
Plant NameNew Hill 1 Battery
Google MapMap
Bing MapMap
Plant StateNC
CountyWake
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDNHBA1
Nameplate Capacity (MW)56
Net Summer Capacity (MW)56
Net Winter Capacity (MW)56
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude35.659692
Longitude-78.94412
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1024

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1024

Sources EV-1d13f2d2043d72b9b4564132
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 204198026d2231df8b562d2b59373c1959a78f793bd3dbf9a640c723d7114871

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel