Gratiot Solar Park / GRTSP
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 50 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-1e1670e4bc4cb51cd11626b5 |
| Net Summer Capacity (MW) | 50 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-1e1670e4bc4cb51cd11626b5 |
| Net Winter Capacity (MW) | 50 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-1e1670e4bc4cb51cd11626b5 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 68850 |
| Plant Name | Gratiot Solar Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Gratiot |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | GRTSP |
| Nameplate Capacity (MW) | 50 |
| Net Summer Capacity (MW) | 50 |
| Net Winter Capacity (MW) | 50 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 43.436999 |
| Longitude | -84.49845 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:240 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1530
Sources EV-931d725125a2109e1d2d908dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09a0d78b88a9e1438ead61cdc0a1fbf69da84419f30475e8c2564c2fa5132f5a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:240
Sources EV-1e1670e4bc4cb51cd11626b5Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0420121cd7406e3ca5d03a3344e9e654d081609baa3b73059689b668c474d989
Usage terms US government public domain
