Power assets and projects · USA · eia860m

Gratiot Solar Park / GRTSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)50 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-1e1670e4bc4cb51cd11626b5
Net Summer Capacity (MW)50 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-1e1670e4bc4cb51cd11626b5
Net Winter Capacity (MW)50 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-1e1670e4bc4cb51cd11626b5
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID68850
Plant NameGratiot Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyGratiot
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDGRTSP
Nameplate Capacity (MW)50
Net Summer Capacity (MW)50
Net Winter Capacity (MW)50
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month10
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude43.436999
Longitude-84.49845
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:240

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1530

Sources EV-931d725125a2109e1d2d908d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09a0d78b88a9e1438ead61cdc0a1fbf69da84419f30475e8c2564c2fa5132f5a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:240

Sources EV-1e1670e4bc4cb51cd11626b5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0420121cd7406e3ca5d03a3344e9e654d081609baa3b73059689b668c474d989

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Gratiot Solar Park / GRTSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID68850
Plant NameGratiot Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyGratiot
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDGRTSP
Nameplate Capacity (MW)50
Net Summer Capacity (MW)50
Net Winter Capacity (MW)50
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month10
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude43.436999
Longitude-84.49845
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:240

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:240

Sources EV-1e1670e4bc4cb51cd11626b5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0420121cd7406e3ca5d03a3344e9e654d081609baa3b73059689b668c474d989

Usage terms US government public domain

Source snapshots by date · USA · eia860

Gratiot Solar Park / GRTSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code68850
Plant NameGratiot Solar Park
StateMI
CountyGratiot
Generator IDGRTSP
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)50
Nameplate Power Factor0.95
Summer Capacity (MW)50
Winter Capacity (MW)50
StatusU
Effective Month11
Effective Year2026
Current Month9
Current Year2026
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1SUN
Multiple Fuels?N
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1530

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1530

Sources EV-931d725125a2109e1d2d908d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09a0d78b88a9e1438ead61cdc0a1fbf69da84419f30475e8c2564c2fa5132f5a

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel