Rio Lago Solar / RIOLA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 123 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-59a6994847cb087de97b8234 |
| Net Summer Capacity (MW) | 123 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-59a6994847cb087de97b8234 |
| Net Winter Capacity (MW) | 123 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-59a6994847cb087de97b8234 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 66635 |
| Entity Name | Rio Lago Solar, LLC |
| Plant ID | 68155 |
| Plant Name | Rio Lago Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Bandera |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | RIOLA |
| Nameplate Capacity (MW) | 123 |
| Net Summer Capacity (MW) | 123 |
| Net Winter Capacity (MW) | 123 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 29.756134 |
| Longitude | -99.09524 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:72 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1118
Sources EV-3b7b9306c968664a1a1b0508Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 94de102ecfad8f4fa7fc2e4cb590ae5996d1863cd6befcd0fbd1ec41c2373d2a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:72
Sources EV-59a6994847cb087de97b8234Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e8d2d5ccf298aa477df869b747f3b6a2229e3de0d269f7779de9a62a8cf6409a
Usage terms US government public domain
