Power assets and projects · USA · eia860m

Rio Lago Solar / RIOLA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)123 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-59a6994847cb087de97b8234
Net Summer Capacity (MW)123 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-59a6994847cb087de97b8234
Net Winter Capacity (MW)123 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-59a6994847cb087de97b8234
Detailed source fields
Original source fieldPublished value or condition
Entity ID66635
Entity NameRio Lago Solar, LLC
Plant ID68155
Plant NameRio Lago Solar
Google MapMap
Bing MapMap
Plant StateTX
CountyBandera
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDRIOLA
Nameplate Capacity (MW)123
Net Summer Capacity (MW)123
Net Winter Capacity (MW)123
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude29.756134
Longitude-99.09524
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:72

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1118

Sources EV-3b7b9306c968664a1a1b0508
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 94de102ecfad8f4fa7fc2e4cb590ae5996d1863cd6befcd0fbd1ec41c2373d2a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:72

Sources EV-59a6994847cb087de97b8234
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e8d2d5ccf298aa477df869b747f3b6a2229e3de0d269f7779de9a62a8cf6409a

Usage terms US government public domain

Source snapshots by date · USA · eia860

Rio Lago Solar / RIOLA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID66635
Utility NameRio Lago Solar, LLC
Plant Code68155
Plant NameRio Lago Solar
StateTX
CountyBandera
Generator IDRIOLA
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationTo be provided by ERCOT at MRD
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCTo be provided by ERCOT at MRD
Nameplate Capacity (MW)123
Summer Capacity (MW)123
Winter Capacity (MW)123
StatusTS
Effective Month12
Effective Year2025
Current Month8
Current Year2026
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Carbon Capture Technology?N
Multiple Fuels?N
Original textTS
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1118

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1118

Sources EV-3b7b9306c968664a1a1b0508
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 94de102ecfad8f4fa7fc2e4cb590ae5996d1863cd6befcd0fbd1ec41c2373d2a

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Rio Lago Solar / RIOLA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID66635
Entity NameRio Lago Solar, LLC
Plant ID68155
Plant NameRio Lago Solar
Google MapMap
Bing MapMap
Plant StateTX
CountyBandera
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDRIOLA
Nameplate Capacity (MW)123
Net Summer Capacity (MW)123
Net Winter Capacity (MW)123
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude29.756134
Longitude-99.09524
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:72

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:72

Sources EV-59a6994847cb087de97b8234
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e8d2d5ccf298aa477df869b747f3b6a2229e3de0d269f7779de9a62a8cf6409a

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel