Aurora 7-SLCHI307 / CH307
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-6889454017c4e05bd2ac8818 |
| Net Summer Capacity (MW) | 1.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-6889454017c4e05bd2ac8818 |
| Net Winter Capacity (MW) | 1.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-6889454017c4e05bd2ac8818 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65869 |
| Entity Name | Prologis Logistics Services Incorporated |
| Plant ID | 68119 |
| Plant Name | Aurora 7-SLCHI307 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | Kane |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | CH307 |
| Nameplate Capacity (MW) | 1.9 |
| Net Summer Capacity (MW) | 1.9 |
| Net Winter Capacity (MW) | 1.9 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 41.79698 |
| Longitude | -88.26809 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:756 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1092
Sources EV-bc6a70384ea2537bbe4bad61Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 418e0b8640fba0969807c53fe8c7f653cafcb099b2a3428441b6a1fffbb04dc9
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:756
Sources EV-6889454017c4e05bd2ac8818Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f202875f5b6c792eac09a830c28ac8677cc2685dde1eeb74802cdc3ce699960d
Usage terms US government public domain
