Addison 11-SLCHI404 / CH404
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.6 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-0ab6d08a3a4c7a261f1a1ff4 |
| Net Summer Capacity (MW) | 1.6 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-0ab6d08a3a4c7a261f1a1ff4 |
| Net Winter Capacity (MW) | 1.6 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-0ab6d08a3a4c7a261f1a1ff4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65869 |
| Entity Name | Prologis Logistics Services Incorporated |
| Plant ID | 68118 |
| Plant Name | Addison 11-SLCHI404 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | DuPage |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | CH404 |
| Nameplate Capacity (MW) | 1.6 |
| Net Summer Capacity (MW) | 1.6 |
| Net Winter Capacity (MW) | 1.6 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 41.930327 |
| Longitude | -88.04848 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:70 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1091
Sources EV-0cf412489ccead4d0bf0cbb2Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 35c23e7db1dbe1d3cd90b804b605d988ef1bc738a894896bfa90df099d804e84
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:70
Sources EV-0ab6d08a3a4c7a261f1a1ff4Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fed554946158487fdc68d828804c5516ea3a96ad52e92f500dceea1b2e52e096
Usage terms US government public domain
