Meadow Springs Renewable Energy (Hybrid) / MSPRE
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ec5cf77b77f90041f9dd4e19 |
| Net Summer Capacity (MW) | 150 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ec5cf77b77f90041f9dd4e19 |
| Net Winter Capacity (MW) | 150 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ec5cf77b77f90041f9dd4e19 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67986 |
| Plant Name | Meadow Springs Renewable Energy (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | White |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | MSPRE |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 38.029 |
| Longitude | -88.284 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1564 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:992
Sources EV-87f73d8795a0f43395e90912Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9a5601e40b0e2150039925d3c831523684caa1e5d41c26f4f361afb594d471cd
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1564
Sources EV-ec5cf77b77f90041f9dd4e19Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 add5a267be932c3fa652ec152c29eb458bf8bf4cbab3cc4a949262bf413049a0
Usage terms US government public domain
