Meadow Springs Renewable Energy (Hybrid) / MSPRE
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-ec5cf77b77f90041f9dd4e19 |
| Net Summer Capacity (MW) | 150 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-ec5cf77b77f90041f9dd4e19 |
| Net Winter Capacity (MW) | 150 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-ec5cf77b77f90041f9dd4e19 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67986 |
| Plant Name | Meadow Springs Renewable Energy (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | White |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | MSPRE |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 38.029 |
| Longitude | -88.284 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1564 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:992
依据 EV-87f73d8795a0f43395e90912资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9a5601e40b0e2150039925d3c831523684caa1e5d41c26f4f361afb594d471cd
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1564
依据 EV-ec5cf77b77f90041f9dd4e19资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 add5a267be932c3fa652ec152c29eb458bf8bf4cbab3cc4a949262bf413049a0