Athens Solar I (Hybrid) / ATHS1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a9c8b53a3bdc34d0f8f056fb |
| Net Summer Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a9c8b53a3bdc34d0f8f056fb |
| Net Winter Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-a9c8b53a3bdc34d0f8f056fb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67982 |
| Plant Name | Athens Solar I (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Placer |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | ATHS1 |
| Nameplate Capacity (MW) | 250 |
| Net Summer Capacity (MW) | 250 |
| Net Winter Capacity (MW) | 250 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 35.754889 |
| Longitude | -121.4071 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1561 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:984
Sources EV-77112ebd0947f69a8ce2b2d4Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 917332abcfeaaee251820a010ee28f85d5023f502a02f8c92b114fed2f8c8302
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1561
Sources EV-a9c8b53a3bdc34d0f8f056fbEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fdf95177ccb23639822be50e97138d52a04bd46a86cf8d796665f47facb49e00
Usage terms US government public domain
