Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Athens Solar I (Hybrid)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
230 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-b72ee44683d518bc43184e80
Detailed source fields
Original source field
Published value or condition
Utility ID
64545
Utility Name
Vesper Energy Development LLC
Plant Code
67982
Plant Name
Athens Solar I (Hybrid)
Street Address
TBD
City
Roseville
State
CA
Zip
95626
County
Placer
Latitude
35.754889
Longitude
-121.407074
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Sacramento Municipal Util Dist
Transmission or Distribution System Owner ID
16534
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
230
Energy Storage
Y
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:14934
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.