Bhalu / BHALU
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-81b6e93d2e6715fc0427373b |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-81b6e93d2e6715fc0427373b |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-81b6e93d2e6715fc0427373b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61060 |
| Entity Name | Cypress Creek Renewables |
| Plant ID | 67652 |
| Plant Name | Bhalu |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Howard |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | BHALU |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 32.31219 |
| Longitude | -101.3378 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1281 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:888
Sources EV-70cff4e8392596a44ef908cfEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51e8dbec4d200de210cb2c0917afbf01772fb626116e03e3536e10d00c272fe4
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1281
Sources EV-81b6e93d2e6715fc0427373bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8f3246c8e9776926c44efb7292741539e4a693dc9121e693cfc990453fc24753
Usage terms US government public domain