POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Bhalu / BHALU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-81b6e93d2e6715fc0427373b
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-81b6e93d2e6715fc0427373b
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-81b6e93d2e6715fc0427373b
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID67652
Plant NameBhalu
Google MapMap
Bing MapMap
Plant StateTX
CountyHoward
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDBHALU
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude32.31219
Longitude-101.3378
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1281

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:888

Sources EV-70cff4e8392596a44ef908cf
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51e8dbec4d200de210cb2c0917afbf01772fb626116e03e3536e10d00c272fe4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1281

Sources EV-81b6e93d2e6715fc0427373b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8f3246c8e9776926c44efb7292741539e4a693dc9121e693cfc990453fc24753

Usage terms US government public domain

Source snapshots by date · USA · eia860

Bhalu / BHALU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61060
Utility NameCypress Creek Renewables
Plant Code67652
Plant NameBhalu
StateTX
CountyHoward
Generator IDBHALU
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)200
Summer Capacity (MW)200
Winter Capacity (MW)200
StatusL
Effective Month12
Effective Year2027
Current Month12
Current Year2027
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:888

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:888

Sources EV-70cff4e8392596a44ef908cf
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51e8dbec4d200de210cb2c0917afbf01772fb626116e03e3536e10d00c272fe4

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Bhalu / BHALU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID67652
Plant NameBhalu
Google MapMap
Bing MapMap
Plant StateTX
CountyHoward
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDBHALU
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude32.31219
Longitude-101.3378
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1281

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1281

Sources EV-81b6e93d2e6715fc0427373b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8f3246c8e9776926c44efb7292741539e4a693dc9121e693cfc990453fc24753

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel