Amerada / AMERA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 300 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-ed4826f4029df8696220eb8b |
| Net Summer Capacity (MW) | 300 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-ed4826f4029df8696220eb8b |
| Net Winter Capacity (MW) | 300 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-ed4826f4029df8696220eb8b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61060 |
| Entity Name | Cypress Creek Renewables |
| Plant ID | 67649 |
| Plant Name | Amerada |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Freestone |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | AMERA |
| Nameplate Capacity (MW) | 300 |
| Net Summer Capacity (MW) | 300 |
| Net Winter Capacity (MW) | 300 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 7 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 31.861926 |
| Longitude | -96.11463 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1943 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:886
Sources EV-f9e1df19095dd1696afaf717Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 312df3d009a7f3aea971f3281e421e4cac6689e257e3b5e8935b9723a0ec4635
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1943
Sources EV-ed4826f4029df8696220eb8bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 31055f7619d2d06a6cb3c5265bf8feb9bc1a980da97dd3aa9f45e65d80ca3d45
Usage terms US government public domain
