Power assets and projects · USA · eia860m

Amerada / AMERA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)300 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-ed4826f4029df8696220eb8b
Net Summer Capacity (MW)300 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-ed4826f4029df8696220eb8b
Net Winter Capacity (MW)300 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-ed4826f4029df8696220eb8b
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID67649
Plant NameAmerada
Google MapMap
Bing MapMap
Plant StateTX
CountyFreestone
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDAMERA
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude31.861926
Longitude-96.11463
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1943

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:886

Sources EV-f9e1df19095dd1696afaf717
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 312df3d009a7f3aea971f3281e421e4cac6689e257e3b5e8935b9723a0ec4635

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1943

Sources EV-ed4826f4029df8696220eb8b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 31055f7619d2d06a6cb3c5265bf8feb9bc1a980da97dd3aa9f45e65d80ca3d45

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Amerada / AMERA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID67649
Plant NameAmerada
Google MapMap
Bing MapMap
Plant StateTX
CountyFreestone
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDAMERA
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude31.861926
Longitude-96.11463
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1943

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1943

Sources EV-ed4826f4029df8696220eb8b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 31055f7619d2d06a6cb3c5265bf8feb9bc1a980da97dd3aa9f45e65d80ca3d45

Usage terms US government public domain

Source snapshots by date · USA · eia860

Amerada / AMERA

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61060
Utility NameCypress Creek Renewables
Plant Code67649
Plant NameAmerada
StateTX
CountyFreestone
Generator IDAMERA
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)300
Summer Capacity (MW)300
Winter Capacity (MW)300
StatusL
Effective Month10
Effective Year2026
Current Month7
Current Year2029
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:886

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:886

Sources EV-f9e1df19095dd1696afaf717
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 312df3d009a7f3aea971f3281e421e4cac6689e257e3b5e8935b9723a0ec4635

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel