Maple Leaf Solar / GEN
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 73 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d0552b5614c90ebfe8510514 |
| Net Summer Capacity (MW) | 73 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d0552b5614c90ebfe8510514 |
| Net Winter Capacity (MW) | 73 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d0552b5614c90ebfe8510514 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 59365 |
| Entity Name | Capital Power Corporation |
| Plant ID | 67195 |
| Plant Name | Maple Leaf Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Johnston |
| Balancing Authority Code | DUK |
| Sector | IPP Non-CHP |
| Generator ID | GEN |
| Nameplate Capacity (MW) | 73 |
| Net Summer Capacity (MW) | 73 |
| Net Winter Capacity (MW) | 73 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 35.595 |
| Longitude | -78.317 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:754 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:794
Sources EV-8aafc545afec6569d4aa1e27Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 97f5de0b4118c0f5cc88178f8bfa394ba0b63a476ec432de122b1c53b4de832c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:754
Sources EV-d0552b5614c90ebfe8510514Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5dea53d758c8b4627247b33545d096558f4634e7e0f2b94e15b3e2ab389809a0
Usage terms US government public domain
