Power assets and projects · USA · eia860m

Maple Leaf Solar / GEN

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)73 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-d0552b5614c90ebfe8510514
Net Summer Capacity (MW)73 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-d0552b5614c90ebfe8510514
Net Winter Capacity (MW)73 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-d0552b5614c90ebfe8510514
Detailed source fields
Original source fieldPublished value or condition
Entity ID59365
Entity NameCapital Power Corporation
Plant ID67195
Plant NameMaple Leaf Solar
Google MapMap
Bing MapMap
Plant StateNC
CountyJohnston
Balancing Authority CodeDUK
SectorIPP Non-CHP
Generator IDGEN
Nameplate Capacity (MW)73
Net Summer Capacity (MW)73
Net Winter Capacity (MW)73
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month4
Planned Operation Year2027
Status(T) Regulatory approvals received. Not under construction
Latitude35.595
Longitude-78.317
Original text(T) Regulatory approvals received. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:754

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:794

Sources EV-8aafc545afec6569d4aa1e27
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 97f5de0b4118c0f5cc88178f8bfa394ba0b63a476ec432de122b1c53b4de832c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:754

Sources EV-d0552b5614c90ebfe8510514
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5dea53d758c8b4627247b33545d096558f4634e7e0f2b94e15b3e2ab389809a0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Maple Leaf Solar / GEN

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID59365
Entity NameCapital Power Corporation
Plant ID67195
Plant NameMaple Leaf Solar
Google MapMap
Bing MapMap
Plant StateNC
CountyJohnston
Balancing Authority CodeDUK
SectorIPP Non-CHP
Generator IDGEN
Nameplate Capacity (MW)73
Net Summer Capacity (MW)73
Net Winter Capacity (MW)73
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month4
Planned Operation Year2027
Status(T) Regulatory approvals received. Not under construction
Latitude35.595
Longitude-78.317
Original text(T) Regulatory approvals received. Not under construction
source_record_idPlanned:754

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:754

Sources EV-d0552b5614c90ebfe8510514
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5dea53d758c8b4627247b33545d096558f4634e7e0f2b94e15b3e2ab389809a0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Maple Leaf Solar / GEN

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID59365
Utility NameCapital Power Corporation
Plant Code67195
Plant NameMaple Leaf Solar
StateNC
CountyJohnston
Generator IDGEN
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)73
Summer Capacity (MW)73
Winter Capacity (MW)73
StatusT
Effective Month12
Effective Year2026
Current Month4
Current Year2027
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textT
source_record_id3_1_Generator_Y2025.xlsx#Proposed:794

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:794

Sources EV-8aafc545afec6569d4aa1e27
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 97f5de0b4118c0f5cc88178f8bfa394ba0b63a476ec432de122b1c53b4de832c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel