Bonanza Solar and Storage Project / BZPV
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 300 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-22f3430c27bcd15fd0b955a4 |
| Net Summer Capacity (MW) | 300 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-22f3430c27bcd15fd0b955a4 |
| Net Winter Capacity (MW) | 240 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-22f3430c27bcd15fd0b955a4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64452 |
| Entity Name | EDF Renewables Development, Inc. |
| Plant ID | 66908 |
| Plant Name | Bonanza Solar and Storage Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NV |
| County | Clark |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | BZPV |
| Nameplate Capacity (MW) | 300 |
| Net Summer Capacity (MW) | 300 |
| Net Winter Capacity (MW) | 240 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 36.558 |
| Longitude | -115.799 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1270 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:766
Sources EV-eab8d8f84e492eebf71b1e6cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9098535dfca138195c355dac6cb9f24a21394221aad488c8a0281eb3008c3887
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1270
Sources EV-22f3430c27bcd15fd0b955a4Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bae8caf676c7fe2c2510784dcc9cef95ba62c51186207bb4e77d83227f8d07c9
Usage terms US government public domain
