Albatross Solar, LLC / ALBBA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 50.4 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-070da49cd0c357c990de0175 |
| Net Summer Capacity (MW) | 50.4 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-070da49cd0c357c990de0175 |
| Net Winter Capacity (MW) | 50.4 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-070da49cd0c357c990de0175 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65815 |
| Entity Name | Sunraycer Assets I LLC |
| Plant ID | 66894 |
| Plant Name | Albatross Solar, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | McLennan |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | ALBBA |
| Nameplate Capacity (MW) | 50.4 |
| Net Summer Capacity (MW) | 50.4 |
| Net Winter Capacity (MW) | 50.4 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.484342 |
| Longitude | -97.42239 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1263 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:754
Sources EV-9778bfe99795e86d4b70e9b2Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b370ff2f1f49b6f817acfd476ab4ec0deadcb21682520481df99499fb5d36aa6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1263
Sources EV-070da49cd0c357c990de0175Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 921ce224800e1012d3d843dc6aab3a608603d3e6673343e500b9e10643ac03f4
Usage terms US government public domain