AES Waiawa Phase 2 Solar / WAIBA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 30 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01 |
| Net Summer Capacity (MW) | 30 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01 |
| Net Winter Capacity (MW) | 30 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61012 |
| Entity Name | AES Distributed Energy |
| Plant ID | 66066 |
| Plant Name | AES Waiawa Phase 2 Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | HI |
| County | Honolulu |
| Balancing Authority Code | HECO |
| Sector | IPP Non-CHP |
| Generator ID | WAIBA |
| Nameplate Capacity (MW) | 30 |
| Net Summer Capacity (MW) | 30 |
| Net Winter Capacity (MW) | 30 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 21.43026 |
| Longitude | -157.9779 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:35 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:591
Sources EV-aa7f2fe55cbed81612024f67Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0d867f6e92000faabec29c0230a6649892fad41b73bf9177ba413a9c958db70f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:35
Sources EV-74588cfc565cbdb0ae8b6d01Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 01310136ebfbce8055c0cd773b1d38ea403e6a85b0dd5f35cdc22e280fd1747b
Usage terms US government public domain