Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
AES Waiawa Phase 2 Solar / WAIBA
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
30 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01
Net Summer Capacity (MW)
30 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01
Net Winter Capacity (MW)
30 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-74588cfc565cbdb0ae8b6d01
Detailed source fields
Original source field
Published value or condition
Entity ID
61012
Entity Name
AES Distributed Energy
Plant ID
66066
Plant Name
AES Waiawa Phase 2 Solar
Google Map
Map
Bing Map
Map
Plant State
HI
County
Honolulu
Balancing Authority Code
HECO
Sector
IPP Non-CHP
Generator ID
WAIBA
Nameplate Capacity (MW)
30
Net Summer Capacity (MW)
30
Net Winter Capacity (MW)
30
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
9
Planned Operation Year
2026
Status
(V) Under construction, more than 50 percent complete
Latitude
21.43026
Longitude
-157.9779
Original text
(V) Under construction, more than 50 percent complete