Anode (Springville) BESS / ANOD2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 112.5 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-5878773573bdd8dcfc1cf958 |
| Net Summer Capacity (MW) | 112.5 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-5878773573bdd8dcfc1cf958 |
| Net Winter Capacity (MW) | 112.5 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-5878773573bdd8dcfc1cf958 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 17609 |
| Entity Name | Southern California Edison Co |
| Plant ID | 65458 |
| Plant Name | Anode (Springville) BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Tulare |
| Balancing Authority Code | CISO |
| Sector | Electric Utility |
| Generator ID | ANOD2 |
| Nameplate Capacity (MW) | 112.5 |
| Net Summer Capacity (MW) | 112.5 |
| Net Winter Capacity (MW) | 112.5 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 36.107903 |
| Longitude | -118.9409 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:462 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:530
Sources EV-697fdf4336545cd93bc45a33Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c244db3260f11971a38eb6e8a072b680b80e71aaee3f6ed632fcb711284ae807
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:462
Sources EV-5878773573bdd8dcfc1cf958Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2abfc597f05f725547bc8d235474719973ae6cbdf899d38a6932550f99baecc1
Usage terms US government public domain
