Big Star Solar, LLC (Hybrid) / BGSTB
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 80 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-3ed5ed74675013bac00e4bc5 |
| Net Summer Capacity (MW) | 80 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-3ed5ed74675013bac00e4bc5 |
| Net Winter Capacity (MW) | 80 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-3ed5ed74675013bac00e4bc5 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67192 |
| Entity Name | RWE Clean Energy |
| Plant ID | 64202 |
| Plant Name | Big Star Solar, LLC (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Bastrop |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | BGSTB |
| Nameplate Capacity (MW) | 80 |
| Net Summer Capacity (MW) | 80 |
| Net Winter Capacity (MW) | 80 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 29.894053 |
| Longitude | -97.27054 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:201 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:424
Sources EV-3132cfcbde640ce95d0a2f8bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dd6366d7ba5d56370cb140462661a9a43fd416069e1a25b61e753466a9762b95
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:201
Sources EV-3ed5ed74675013bac00e4bc5Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4000125995d922cc8fe53f91d3cef6db221cdcc9db6fa6195df79d44f22f2e55
Usage terms US government public domain