Power assets and projects · USA · eia860m

Big Star Solar, LLC (Hybrid) / BGSTB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)80 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-3ed5ed74675013bac00e4bc5
Net Summer Capacity (MW)80 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-3ed5ed74675013bac00e4bc5
Net Winter Capacity (MW)80 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-3ed5ed74675013bac00e4bc5
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID64202
Plant NameBig Star Solar, LLC (Hybrid)
Google MapMap
Bing MapMap
Plant StateTX
CountyBastrop
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDBGSTB
Nameplate Capacity (MW)80
Net Summer Capacity (MW)80
Net Winter Capacity (MW)80
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude29.894053
Longitude-97.27054
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:201

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:424

Sources EV-3132cfcbde640ce95d0a2f8b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dd6366d7ba5d56370cb140462661a9a43fd416069e1a25b61e753466a9762b95

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:201

Sources EV-3ed5ed74675013bac00e4bc5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4000125995d922cc8fe53f91d3cef6db221cdcc9db6fa6195df79d44f22f2e55

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Big Star Solar, LLC (Hybrid) / BGSTB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID64202
Plant NameBig Star Solar, LLC (Hybrid)
Google MapMap
Bing MapMap
Plant StateTX
CountyBastrop
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDBGSTB
Nameplate Capacity (MW)80
Net Summer Capacity (MW)80
Net Winter Capacity (MW)80
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude29.894053
Longitude-97.27054
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:201

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:201

Sources EV-3ed5ed74675013bac00e4bc5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4000125995d922cc8fe53f91d3cef6db221cdcc9db6fa6195df79d44f22f2e55

Usage terms US government public domain

Source snapshots by date · USA · eia860

Big Star Solar, LLC (Hybrid) / BGSTB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67192
Utility NameRWE Clean Energy
Plant Code64202
Plant NameBig Star Solar, LLC (Hybrid)
StateTX
CountyBastrop
Generator IDBGSTB
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)80
Summer Capacity (MW)80
Winter Capacity (MW)80
StatusTS
Effective Month4
Effective Year2022
Current Month10
Current Year2026
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Turbines or Hydrokinetic Buoys0
Original textTS
source_record_id3_1_Generator_Y2025.xlsx#Proposed:424

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:424

Sources EV-3132cfcbde640ce95d0a2f8b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dd6366d7ba5d56370cb140462661a9a43fd416069e1a25b61e753466a9762b95

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel