United States of America · Generator · plant location

Spirit Mound / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Basin Electric Power Coop
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.897663, -96.99049

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Spirit Mound / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)67.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Net Summer Capacity (MW)45 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Net Winter Capacity (MW)60 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID6092
Plant NameSpirit Mound
Google MapMap
Bing MapMap
Plant StateSD
CountyClay
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)67.5
Net Summer Capacity (MW)45
Net Winter Capacity (MW)60
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month6
Operating Year1978
Status(OP) Operating
Latitude42.897663
Longitude-96.99049
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6037

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6031

Sources EV-503aace8279cc706aa94a12d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5db5e24c50ff31e662a05fee93c3f9b38a5b0bbd70579d720055d2620ed60b37

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6037

Sources EV-adce1bb351d773dab1e9c2ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bb10e9c97126999a12bf27698112c9bd689d2c04c860d74eda503e9e51c1c5df

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel