Power assets and projects · USA · eia860m

Spirit Mound / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)67.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Net Summer Capacity (MW)45 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Net Winter Capacity (MW)60 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-adce1bb351d773dab1e9c2ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID6092
Plant NameSpirit Mound
Google MapMap
Bing MapMap
Plant StateSD
CountyClay
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)67.5
Net Summer Capacity (MW)45
Net Winter Capacity (MW)60
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month6
Operating Year1978
Status(OP) Operating
Latitude42.897663
Longitude-96.99049
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6037

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6031

Sources EV-503aace8279cc706aa94a12d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5db5e24c50ff31e662a05fee93c3f9b38a5b0bbd70579d720055d2620ed60b37

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6037

Sources EV-adce1bb351d773dab1e9c2ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bb10e9c97126999a12bf27698112c9bd689d2c04c860d74eda503e9e51c1c5df

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Spirit Mound / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID6092
Plant NameSpirit Mound
Google MapMap
Bing MapMap
Plant StateSD
CountyClay
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)67.5
Net Summer Capacity (MW)45
Net Winter Capacity (MW)60
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month6
Operating Year1978
Status(OP) Operating
Latitude42.897663
Longitude-96.99049
Original text(OP) Operating
source_record_idOperating:6037

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6037

Sources EV-adce1bb351d773dab1e9c2ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bb10e9c97126999a12bf27698112c9bd689d2c04c860d74eda503e9e51c1c5df

Usage terms US government public domain

Source snapshots by date · USA · eia860

Spirit Mound / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1307
Utility NameBasin Electric Power Coop
Plant Code6092
Plant NameSpirit Mound
StateSD
CountyClay
Generator ID2
TechnologyPetroleum Liquids
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationWAUESPIRITMUNSPIRIT_2_UNIT_RA
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCWAUE.BEPM.SMS2
Nameplate Capacity (MW)67.5
Nameplate Power Factor0.9
Summer Capacity (MW)45
Winter Capacity (MW)60
Minimum Load (MW)45
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1978
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6031

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6031

Sources EV-503aace8279cc706aa94a12d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5db5e24c50ff31e662a05fee93c3f9b38a5b0bbd70579d720055d2620ed60b37

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel