Brunswick Nuclear / 2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1001.6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c889cb3f814bb6c122986b2b |
| Net Summer Capacity (MW) | 932 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c889cb3f814bb6c122986b2b |
| Net Winter Capacity (MW) | 953 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c889cb3f814bb6c122986b2b |
| Planned Uprate of Summer Capacity (MW) | 13 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c889cb3f814bb6c122986b2b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 6014 |
| Plant Name | Brunswick Nuclear |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Brunswick |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 1001.6 |
| Net Summer Capacity (MW) | 932 |
| Net Winter Capacity (MW) | 953 |
| Technology | Nuclear |
| Energy Source Code | NUC |
| Prime Mover Code | ST |
| Operating Month | 11 |
| Operating Year | 1975 |
| Status | (OP) Operating |
| Planned Uprate Year | 2028 |
| Planned Uprate Month | 3 |
| Planned Uprate of Summer Capacity (MW) | 13 |
| Latitude | 33.9597 |
| Longitude | -78.0114 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:5874 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5868
Sources EV-829f7fb26a3b20f69c436e00Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46f1e95983ea4161ccece746deafcb17e1d88a2b21ecc53881d56fb5a09525c5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5874
Sources EV-c889cb3f814bb6c122986b2bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cece802ccf7508ea4caca371433744102566ae14c686fd065a738f82d411a741
Usage terms US government public domain
