Power assets and projects · USA · eia860m

Brunswick Nuclear / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1001.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c889cb3f814bb6c122986b2b
Net Summer Capacity (MW)932 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c889cb3f814bb6c122986b2b
Net Winter Capacity (MW)953 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c889cb3f814bb6c122986b2b
Planned Uprate of Summer Capacity (MW)13 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c889cb3f814bb6c122986b2b
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID6014
Plant NameBrunswick Nuclear
Google MapMap
Bing MapMap
Plant StateNC
CountyBrunswick
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)1001.6
Net Summer Capacity (MW)932
Net Winter Capacity (MW)953
TechnologyNuclear
Energy Source CodeNUC
Prime Mover CodeST
Operating Month11
Operating Year1975
Status(OP) Operating
Planned Uprate Year2028
Planned Uprate Month3
Planned Uprate of Summer Capacity (MW)13
Latitude33.9597
Longitude-78.0114
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5874

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5868

Sources EV-829f7fb26a3b20f69c436e00
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46f1e95983ea4161ccece746deafcb17e1d88a2b21ecc53881d56fb5a09525c5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5874

Sources EV-c889cb3f814bb6c122986b2b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cece802ccf7508ea4caca371433744102566ae14c686fd065a738f82d411a741

Usage terms US government public domain

Source snapshots by date · USA · eia860

Brunswick Nuclear / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code6014
Plant NameBrunswick Nuclear
StateNC
CountyBrunswick
Generator ID2
TechnologyNuclear
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1001.6
Nameplate Power Factor0.964
Summer Capacity (MW)932
Winter Capacity (MW)953
Minimum Load (MW)932
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year1975
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NUC
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Planned Net Summer Capacity Uprate (MW)13
Planned Net Winter Capacity Uprate (MW)13
Planned Uprate Month3
Planned Uprate Year2028
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:5868

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5868

Sources EV-829f7fb26a3b20f69c436e00
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46f1e95983ea4161ccece746deafcb17e1d88a2b21ecc53881d56fb5a09525c5

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Brunswick Nuclear / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID6014
Plant NameBrunswick Nuclear
Google MapMap
Bing MapMap
Plant StateNC
CountyBrunswick
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)1001.6
Net Summer Capacity (MW)932
Net Winter Capacity (MW)953
TechnologyNuclear
Energy Source CodeNUC
Prime Mover CodeST
Operating Month11
Operating Year1975
Status(OP) Operating
Planned Uprate Year2028
Planned Uprate Month3
Planned Uprate of Summer Capacity (MW)13
Latitude33.9597
Longitude-78.0114
Original text(OP) Operating
source_record_idOperating:5874

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5874

Sources EV-c889cb3f814bb6c122986b2b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cece802ccf7508ea4caca371433744102566ae14c686fd065a738f82d411a741

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel