Lowman Energy Center / LEC3
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 438 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-cf79ca67121bc68498ff255c |
| Net Summer Capacity (MW) | 409 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-cf79ca67121bc68498ff255c |
| Net Winter Capacity (MW) | 448 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-cf79ca67121bc68498ff255c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 189 |
| Entity Name | PowerSouth Energy Cooperative |
| Plant ID | 56 |
| Plant Name | Lowman Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AL |
| County | Washington |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | LEC3 |
| Nameplate Capacity (MW) | 438 |
| Net Summer Capacity (MW) | 409 |
| Net Winter Capacity (MW) | 448 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 11 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 31.488019 |
| Longitude | -87.91075 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1991 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:3
Sources EV-0ef9e0da2c808a47d1ccfc58Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1140d2d885992765e8221155ef7d0bcf51154eb598b4ae1f25e06b35f3a73f37
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1991
Sources EV-cf79ca67121bc68498ff255cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c1accb19a08ca20e921e1cf4a73da61b23394a279cf4034f2340f96f9c55d218
Usage terms US government public domain
