Power assets and projects · USA · eia860m

Lowman Energy Center / LEC3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)438 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cf79ca67121bc68498ff255c
Net Summer Capacity (MW)409 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cf79ca67121bc68498ff255c
Net Winter Capacity (MW)448 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cf79ca67121bc68498ff255c
Detailed source fields
Original source fieldPublished value or condition
Entity ID189
Entity NamePowerSouth Energy Cooperative
Plant ID56
Plant NameLowman Energy Center
Google MapMap
Bing MapMap
Plant StateAL
CountyWashington
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDLEC3
Nameplate Capacity (MW)438
Net Summer Capacity (MW)409
Net Winter Capacity (MW)448
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month11
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude31.488019
Longitude-87.91075
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1991

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:3

Sources EV-0ef9e0da2c808a47d1ccfc58
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1140d2d885992765e8221155ef7d0bcf51154eb598b4ae1f25e06b35f3a73f37

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1991

Sources EV-cf79ca67121bc68498ff255c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c1accb19a08ca20e921e1cf4a73da61b23394a279cf4034f2340f96f9c55d218

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lowman Energy Center / LEC3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID189
Utility NamePowerSouth Energy Cooperative
Plant Code56
Plant NameLowman Energy Center
StateAL
CountyWashington
Generator IDLEC3
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)438
Nameplate Power Factor0.85
Summer Capacity (MW)409
Winter Capacity (MW)448
StatusL
Effective Month11
Effective Year2029
Current Month11
Current Year2029
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:3

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:3

Sources EV-0ef9e0da2c808a47d1ccfc58
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1140d2d885992765e8221155ef7d0bcf51154eb598b4ae1f25e06b35f3a73f37

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lowman Energy Center / LEC3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID189
Entity NamePowerSouth Energy Cooperative
Plant ID56
Plant NameLowman Energy Center
Google MapMap
Bing MapMap
Plant StateAL
CountyWashington
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDLEC3
Nameplate Capacity (MW)438
Net Summer Capacity (MW)409
Net Winter Capacity (MW)448
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month11
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude31.488019
Longitude-87.91075
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1991

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1991

Sources EV-cf79ca67121bc68498ff255c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c1accb19a08ca20e921e1cf4a73da61b23394a279cf4034f2340f96f9c55d218

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel