Lange Generating Station / IC04
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 16.6 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e689e270d003b489a80dae4d |
| Net Summer Capacity (MW) | 16.3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e689e270d003b489a80dae4d |
| Net Winter Capacity (MW) | 16.3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e689e270d003b489a80dae4d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19545 |
| Entity Name | Black Hills Power, Inc. |
| Plant ID | 55478 |
| Plant Name | Lange Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SD |
| County | Pennington |
| Balancing Authority Code | WACM |
| Sector | Electric Utility |
| Generator ID | IC04 |
| Nameplate Capacity (MW) | 16.6 |
| Net Summer Capacity (MW) | 16.3 |
| Net Winter Capacity (MW) | 16.3 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 44.1218 |
| Longitude | -103.2641 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:438 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:178
Sources EV-2b2054ed1b668ec4abbcc5e2Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 376643696ae7cd0a5d5283199bf8996396ae6c7be55ede36d9f787de31eb0a8c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:438
Sources EV-e689e270d003b489a80dae4dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4614791749f1fab3fa9ff79629c1e946d43f98ff0cddfc37d8be397db1ed8736
Usage terms US government public domain
