POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Lange Generating Station / IC04

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)16.6 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-e689e270d003b489a80dae4d
Net Summer Capacity (MW)16.3 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-e689e270d003b489a80dae4d
Net Winter Capacity (MW)16.3 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-e689e270d003b489a80dae4d
Detailed source fields
Original source fieldPublished value or condition
Entity ID19545
Entity NameBlack Hills Power, Inc.
Plant ID55478
Plant NameLange Generating Station
Google MapMap
Bing MapMap
Plant StateSD
CountyPennington
Balancing Authority CodeWACM
SectorElectric Utility
Generator IDIC04
Nameplate Capacity (MW)16.6
Net Summer Capacity (MW)16.3
Net Winter Capacity (MW)16.3
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month12
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude44.1218
Longitude-103.2641
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:438

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:178

Sources EV-2b2054ed1b668ec4abbcc5e2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 376643696ae7cd0a5d5283199bf8996396ae6c7be55ede36d9f787de31eb0a8c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:438

Sources EV-e689e270d003b489a80dae4d
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4614791749f1fab3fa9ff79629c1e946d43f98ff0cddfc37d8be397db1ed8736

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lange Generating Station / IC04

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19545
Utility NameBlack Hills Power, Inc.
Plant Code55478
Plant NameLange Generating Station
StateSD
CountyPennington
Generator IDIC04
TechnologyNatural Gas Internal Combustion Engine
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)16.6
Nameplate Power Factor0.85
Summer Capacity (MW)16.3
Winter Capacity (MW)16.3
StatusT
Effective Month9
Effective Year2026
Current Month12
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Energy Source 2DFO
Multiple Fuels?Y
Switch Between Oil and Natural Gas?Y
Cofire Fuels?N
Original textT
source_record_id3_1_Generator_Y2025.xlsx#Proposed:178

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:178

Sources EV-2b2054ed1b668ec4abbcc5e2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 376643696ae7cd0a5d5283199bf8996396ae6c7be55ede36d9f787de31eb0a8c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lange Generating Station / IC04

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19545
Entity NameBlack Hills Power, Inc.
Plant ID55478
Plant NameLange Generating Station
Google MapMap
Bing MapMap
Plant StateSD
CountyPennington
Balancing Authority CodeWACM
SectorElectric Utility
Generator IDIC04
Nameplate Capacity (MW)16.6
Net Summer Capacity (MW)16.3
Net Winter Capacity (MW)16.3
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month12
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude44.1218
Longitude-103.2641
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:438

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:438

Sources EV-e689e270d003b489a80dae4d
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4614791749f1fab3fa9ff79629c1e946d43f98ff0cddfc37d8be397db1ed8736

Usage terms US government public domain

AI-DC KOREA MEMBER