Biron / 5
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-445f6c3f2447caf7e90f78f7 |
| Net Summer Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-445f6c3f2447caf7e90f78f7 |
| Net Winter Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-445f6c3f2447caf7e90f78f7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 4247 |
| Entity Name | Consolidated Water Power Co |
| Plant ID | 3971 |
| Plant Name | Biron |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Wood |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 5 |
| Nameplate Capacity (MW) | 0.5 |
| Net Summer Capacity (MW) | 0.5 |
| Net Winter Capacity (MW) | 0.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 1 |
| Operating Year | 1896 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 44.4306 |
| Longitude | -89.7808 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:5513 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5508
Sources EV-b48f25508e0405c6bc60a462Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 277e16b39b69e0fe4f5c13eda691e55f44a999007409b648de3dc329438821d3
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5513
Sources EV-445f6c3f2447caf7e90f78f7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4f2c3a51e778a15ddd24471ff564013fab1bcca88fe770f20731487a2c9f75df
Usage terms US government public domain
