United States of America · Generator · plant location

Biron / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Consolidated Water Power Co
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.4306, -89.7808

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Biron / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3768c5791e2ebb2e73fa3dd2
Net Summer Capacity (MW)1.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3768c5791e2ebb2e73fa3dd2
Net Winter Capacity (MW)1.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3768c5791e2ebb2e73fa3dd2
Detailed source fields
Original source fieldPublished value or condition
Entity ID4247
Entity NameConsolidated Water Power Co
Plant ID3971
Plant NameBiron
Google MapMap
Bing MapMap
Plant StateWI
CountyWood
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)1.4
Net Summer Capacity (MW)1.3
Net Winter Capacity (MW)1.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1921
Status(OP) Operating
Latitude44.4306
Longitude-89.7808
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5510

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5505

Sources EV-c2d68f561c72b8bfedc11b15
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bc115286db00c3b95d875d4a45af2630b65bd05db4d2fbd346a650128e499828

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5510

Sources EV-3768c5791e2ebb2e73fa3dd2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 099ea541c3424b1bb5529411fc6995f0a6a08be749547aecab17ceddb83b1ba9

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel