Chesterfield / CERC4
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 250 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-897b29e69c15fbdf3d3c1f8f |
| Net Summer Capacity (MW) | 233.9 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-897b29e69c15fbdf3d3c1f8f |
| Net Winter Capacity (MW) | 243.8 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-897b29e69c15fbdf3d3c1f8f |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19876 |
| Entity Name | Virginia Electric & Power Co |
| Plant ID | 3797 |
| Plant Name | Chesterfield |
| Google Map | Map |
| Bing Map | Map |
| Plant State | VA |
| County | Chesterfield |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | CERC4 |
| Nameplate Capacity (MW) | 250 |
| Net Summer Capacity (MW) | 233.9 |
| Net Winter Capacity (MW) | 243.8 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 6 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 37.3822 |
| Longitude | -77.3833 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1904 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:96
Sources EV-cbbd1efe554d04761a6572d0Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f16d076ab2de1fcf5af31ba9c5f189281624a5f323ee975704d74e4a7121d372
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1904
Sources EV-897b29e69c15fbdf3d3c1f8fEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 44c018ff12f7bff28dbd1f7a73bbc199313c378f50856cf7e4ee1c5e96cd9f9e
Usage terms US government public domain
