Power assets and projects · USA · eia860m

Chesterfield / CERC4

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)250 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-897b29e69c15fbdf3d3c1f8f
Net Summer Capacity (MW)233.9 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-897b29e69c15fbdf3d3c1f8f
Net Winter Capacity (MW)243.8 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-897b29e69c15fbdf3d3c1f8f
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID3797
Plant NameChesterfield
Google MapMap
Bing MapMap
Plant StateVA
CountyChesterfield
Balancing Authority CodePJM
SectorElectric Utility
Generator IDCERC4
Nameplate Capacity (MW)250
Net Summer Capacity (MW)233.9
Net Winter Capacity (MW)243.8
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month6
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude37.3822
Longitude-77.3833
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1904

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:96

Sources EV-cbbd1efe554d04761a6572d0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f16d076ab2de1fcf5af31ba9c5f189281624a5f323ee975704d74e4a7121d372

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1904

Sources EV-897b29e69c15fbdf3d3c1f8f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 44c018ff12f7bff28dbd1f7a73bbc199313c378f50856cf7e4ee1c5e96cd9f9e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Chesterfield / CERC4

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID3797
Plant NameChesterfield
Google MapMap
Bing MapMap
Plant StateVA
CountyChesterfield
Balancing Authority CodePJM
SectorElectric Utility
Generator IDCERC4
Nameplate Capacity (MW)250
Net Summer Capacity (MW)233.9
Net Winter Capacity (MW)243.8
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month6
Planned Operation Year2029
Status(L) Regulatory approvals pending. Not under construction
Latitude37.3822
Longitude-77.3833
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1904

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1904

Sources EV-897b29e69c15fbdf3d3c1f8f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 44c018ff12f7bff28dbd1f7a73bbc199313c378f50856cf7e4ee1c5e96cd9f9e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Chesterfield / CERC4

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19876
Utility NameVirginia Electric & Power Co
Plant Code3797
Plant NameChesterfield
StateVA
CountyChesterfield
Generator IDCERC4
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)250
Nameplate Power Factor0.85
Summer Capacity (MW)233.9
Winter Capacity (MW)243.8
StatusL
Effective Month6
Effective Year2029
Current Month6
Current Year2029
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Multiple Fuels?Y
Switch Between Oil and Natural Gas?Y
Cofire Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:96

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:96

Sources EV-cbbd1efe554d04761a6572d0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f16d076ab2de1fcf5af31ba9c5f189281624a5f323ee975704d74e4a7121d372

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel