Nolte / 1
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8 |
| Net Summer Capacity (MW) | 1.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8 |
| Net Winter Capacity (MW) | 1.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 7751 |
| Entity Name | Guadalupe Blanco River Authority |
| Plant ID | 3585 |
| Plant Name | Nolte |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Guadalupe |
| Balancing Authority Code | ERCO |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 1.2 |
| Net Summer Capacity (MW) | 1.2 |
| Net Winter Capacity (MW) | 1.2 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 1 |
| Operating Year | 1927 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 29.537565 |
| Longitude | -97.93211 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:5062 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5057
Sources EV-4ad3791c41a897dfa9b500cbEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1e3be54b05bb4e81d707aa20a5ff3b86854ae6d54d076d4d3fb983224b20c396
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5062
Sources EV-d0465c591e6bc4f5b56090b8Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 60c6d852ec8e0e51bdcfd73d6003f9640c1ac9b265a5333b976ccfb0b233e4af
Usage terms US government public domain
