POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Nolte / 1

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-d0465c591e6bc4f5b56090b8
Net Summer Capacity (MW)1.2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-d0465c591e6bc4f5b56090b8
Net Winter Capacity (MW)1.2 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-d0465c591e6bc4f5b56090b8
Detailed source fields
Original source fieldPublished value or condition
Entity ID7751
Entity NameGuadalupe Blanco River Authority
Plant ID3585
Plant NameNolte
Google MapMap
Bing MapMap
Plant StateTX
CountyGuadalupe
Balancing Authority CodeERCO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1927
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude29.537565
Longitude-97.93211
Original text(OS) Out of service and NOT expected to return to service in next calendar year
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5062

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5057

Sources EV-4ad3791c41a897dfa9b500cb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1e3be54b05bb4e81d707aa20a5ff3b86854ae6d54d076d4d3fb983224b20c396

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5062

Sources EV-d0465c591e6bc4f5b56090b8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 60c6d852ec8e0e51bdcfd73d6003f9640c1ac9b265a5333b976ccfb0b233e4af

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Nolte / 1

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7751
Entity NameGuadalupe Blanco River Authority
Plant ID3585
Plant NameNolte
Google MapMap
Bing MapMap
Plant StateTX
CountyGuadalupe
Balancing Authority CodeERCO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1927
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude29.537565
Longitude-97.93211
Original text(OS) Out of service and NOT expected to return to service in next calendar year
source_record_idOperating:5062

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5062

Sources EV-d0465c591e6bc4f5b56090b8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 60c6d852ec8e0e51bdcfd73d6003f9640c1ac9b265a5333b976ccfb0b233e4af

Usage terms US government public domain

Source snapshots by date · USA · eia860

Nolte / 1

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7751
Utility NameGuadalupe Blanco River Authority
Plant Code3585
Plant NameNolte
StateTX
CountyGuadalupe
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.2
Nameplate Power Factor0.8
Summer Capacity (MW)1.2
Winter Capacity (MW)1.2
Minimum Load (MW)0.6
Uprate or Derate Completed During YearN
StatusOS
Synchronized to Transmission GridX
Operating Month1
Operating Year1927
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOS
source_record_id3_1_Generator_Y2025.xlsx#Operable:5057

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5057

Sources EV-4ad3791c41a897dfa9b500cb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1e3be54b05bb4e81d707aa20a5ff3b86854ae6d54d076d4d3fb983224b20c396

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel