Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Nolte / 1
Generator · Out of service
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
1.2 MW
Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8
Net Summer Capacity (MW)
1.2 MW
Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8
Net Winter Capacity (MW)
1.2 MW
Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-d0465c591e6bc4f5b56090b8
Detailed source fields
Original source field
Published value or condition
Entity ID
7751
Entity Name
Guadalupe Blanco River Authority
Plant ID
3585
Plant Name
Nolte
Google Map
Map
Bing Map
Map
Plant State
TX
County
Guadalupe
Balancing Authority Code
ERCO
Sector
Electric Utility
Generator ID
1
Nameplate Capacity (MW)
1.2
Net Summer Capacity (MW)
1.2
Net Winter Capacity (MW)
1.2
Technology
Conventional Hydroelectric
Energy Source Code
WAT
Prime Mover Code
HY
Operating Month
1
Operating Year
1927
Status
(OS) Out of service and NOT expected to return to service in next calendar year
Latitude
29.537565
Longitude
-97.93211
Original text
(OS) Out of service and NOT expected to return to service in next calendar year