Newman / CT2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 85 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7328a2f0acd1b8aba5a225a6 |
| Net Summer Capacity (MW) | 67 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7328a2f0acd1b8aba5a225a6 |
| Net Winter Capacity (MW) | 71 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7328a2f0acd1b8aba5a225a6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5701 |
| Entity Name | El Paso Electric Co |
| Plant ID | 3456 |
| Plant Name | Newman |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | El Paso |
| Balancing Authority Code | EPE |
| Sector | Electric Utility |
| Generator ID | CT2 |
| Unit Code | 4CC |
| Nameplate Capacity (MW) | 85 |
| Net Summer Capacity (MW) | 67 |
| Net Winter Capacity (MW) | 71 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 8 |
| Operating Year | 1975 |
| Planned Retirement Month | 12 |
| Planned Retirement Year | 2031 |
| Status | (OP) Operating |
| Latitude | 31.983587 |
| Longitude | -106.4318 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4960 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4955
Sources EV-e5970bd196651982cc98597eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 54e47e4ce273fa8446a946c21f730a59b3f39b9bddf616a71004d4a979778da0
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4960
Sources EV-7328a2f0acd1b8aba5a225a6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1b518c5d926e12301ee6a03a34a3d46e3b8f42ed72b865cd7abd91f03ef10ec6
Usage terms US government public domain
