Rio Grande / 7
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 50 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ac7c2c0ebfb852cccea06782 |
| Net Summer Capacity (MW) | 43 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ac7c2c0ebfb852cccea06782 |
| Net Winter Capacity (MW) | 43 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ac7c2c0ebfb852cccea06782 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5701 |
| Entity Name | El Paso Electric Co |
| Plant ID | 2444 |
| Plant Name | Rio Grande |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NM |
| County | Dona Ana |
| Balancing Authority Code | EPE |
| Sector | Electric Utility |
| Generator ID | 7 |
| Nameplate Capacity (MW) | 50 |
| Net Summer Capacity (MW) | 43 |
| Net Winter Capacity (MW) | 43 |
| Technology | Natural Gas Steam Turbine |
| Energy Source Code | NG |
| Prime Mover Code | ST |
| Operating Month | 6 |
| Operating Year | 1958 |
| Planned Retirement Month | 12 |
| Planned Retirement Year | 2027 |
| Status | (OP) Operating |
| Latitude | 31.8047 |
| Longitude | -106.5472 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3674 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3669
Sources EV-6dfdf745848985203058401aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ff64d4a6e289a1e3376daf61bc4ba1d75f0aca32c677b45fe778ee9d76ae09ed
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3674
Sources EV-ac7c2c0ebfb852cccea06782Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 93e568cccc464fd4eebcab547bedf7959897ee566142b2522f5edb58bfc789af
Usage terms US government public domain
