POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Rio Grande / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)50 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac7c2c0ebfb852cccea06782
Net Summer Capacity (MW)43 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac7c2c0ebfb852cccea06782
Net Winter Capacity (MW)43 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac7c2c0ebfb852cccea06782
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID2444
Plant NameRio Grande
Google MapMap
Bing MapMap
Plant StateNM
CountyDona Ana
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)50
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month6
Operating Year1958
Planned Retirement Month12
Planned Retirement Year2027
Status(OP) Operating
Latitude31.8047
Longitude-106.5472
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3674

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3669

Sources EV-6dfdf745848985203058401a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ff64d4a6e289a1e3376daf61bc4ba1d75f0aca32c677b45fe778ee9d76ae09ed

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3674

Sources EV-ac7c2c0ebfb852cccea06782
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 93e568cccc464fd4eebcab547bedf7959897ee566142b2522f5edb58bfc789af

Usage terms US government public domain

Source snapshots by date · USA · eia860

Rio Grande / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5701
Utility NameEl Paso Electric Co
Plant Code2444
Plant NameRio Grande
StateNM
CountyDona Ana
Generator ID7
TechnologyNatural Gas Steam Turbine
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)50
Nameplate Power Factor0.85
Summer Capacity (MW)43
Winter Capacity (MW)43
Minimum Load (MW)18
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1958
Planned Retirement Month12
Planned Retirement Year2027
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Startup Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full LoadOVER
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3669

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3669

Sources EV-6dfdf745848985203058401a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ff64d4a6e289a1e3376daf61bc4ba1d75f0aca32c677b45fe778ee9d76ae09ed

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Rio Grande / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID2444
Plant NameRio Grande
Google MapMap
Bing MapMap
Plant StateNM
CountyDona Ana
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)50
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month6
Operating Year1958
Planned Retirement Month12
Planned Retirement Year2027
Status(OP) Operating
Latitude31.8047
Longitude-106.5472
Original text(OP) Operating
source_record_idOperating:3674

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3674

Sources EV-ac7c2c0ebfb852cccea06782
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 93e568cccc464fd4eebcab547bedf7959897ee566142b2522f5edb58bfc789af

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel