Pender / 3
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-0057fd81e1e5692d37eecc72 |
| Net Summer Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-0057fd81e1e5692d37eecc72 |
| Net Winter Capacity (MW) | 0.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-0057fd81e1e5692d37eecc72 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 14656 |
| Entity Name | City of Pender - (NE) |
| Plant ID | 2296 |
| Plant Name | Pender |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NE |
| County | Thurston |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 0.5 |
| Net Summer Capacity (MW) | 0.5 |
| Net Winter Capacity (MW) | 0.5 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | IC |
| Operating Month | 1 |
| Operating Year | 1953 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 42.114742 |
| Longitude | -96.70543 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3499 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3493
Sources EV-1846733f44b0e01b87f3756aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 67ab6a9336de4aacf08ef3ca5f9d271ea51c98b6d9f58d4ca0a3406325797bf3
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3499
Sources EV-0057fd81e1e5692d37eecc72Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c6cf46dbd3006ab6b8c40e80715087aba7dbec95dfd66f934694d1c9bab24c28
Usage terms US government public domain
