Pender / 3

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.5 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-0057fd81e1e5692d37eecc72
Net Summer Capacity (MW)0.5 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-0057fd81e1e5692d37eecc72
Net Winter Capacity (MW)0.5 MWOriginal source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year
As-of date 2026-08
Sources EV-0057fd81e1e5692d37eecc72
Detailed source fields
Original source fieldPublished value or condition
Entity ID14656
Entity NameCity of Pender - (NE)
Plant ID2296
Plant NamePender
Google MapMap
Bing MapMap
Plant StateNE
CountyThurston
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month1
Operating Year1953
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude42.114742
Longitude-96.70543
Original text(OS) Out of service and NOT expected to return to service in next calendar year
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3499

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3493

Sources EV-1846733f44b0e01b87f3756a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 67ab6a9336de4aacf08ef3ca5f9d271ea51c98b6d9f58d4ca0a3406325797bf3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3499

Sources EV-0057fd81e1e5692d37eecc72
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c6cf46dbd3006ab6b8c40e80715087aba7dbec95dfd66f934694d1c9bab24c28

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Pender / 3

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID14656
Entity NameCity of Pender - (NE)
Plant ID2296
Plant NamePender
Google MapMap
Bing MapMap
Plant StateNE
CountyThurston
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month1
Operating Year1953
Status(OS) Out of service and NOT expected to return to service in next calendar year
Latitude42.114742
Longitude-96.70543
Original text(OS) Out of service and NOT expected to return to service in next calendar year
source_record_idOperating:3499

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3499

Sources EV-0057fd81e1e5692d37eecc72
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c6cf46dbd3006ab6b8c40e80715087aba7dbec95dfd66f934694d1c9bab24c28

Usage terms US government public domain

Source snapshots by date · USA · eia860

Pender / 3

Generator · Out of service

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID14656
Utility NameCity of Pender - (NE)
Plant Code2296
Plant NamePender
StateNE
CountyThurston
Generator ID3
TechnologyPetroleum Liquids
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.5
Nameplate Power Factor1
Summer Capacity (MW)0.5
Winter Capacity (MW)0.5
Minimum Load (MW)0.5
Uprate or Derate Completed During YearN
StatusOS
Synchronized to Transmission GridX
Operating Month1
Operating Year1953
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Energy Source 2NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOS
source_record_id3_1_Generator_Y2025.xlsx#Operable:3493

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3493

Sources EV-1846733f44b0e01b87f3756a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 67ab6a9336de4aacf08ef3ca5f9d271ea51c98b6d9f58d4ca0a3406325797bf3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel