Thompson Falls / TF2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc |
| Net Summer Capacity (MW) | 6.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc |
| Net Winter Capacity (MW) | 6.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc |
| Planned Uprate of Summer Capacity (MW) | 1.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13902 |
| Entity Name | NorthWestern Energy (MT Hydro) |
| Plant ID | 2195 |
| Plant Name | Thompson Falls |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Sanders |
| Balancing Authority Code | NWMT |
| Sector | Electric Utility |
| Generator ID | TF2 |
| Nameplate Capacity (MW) | 7 |
| Net Summer Capacity (MW) | 6.5 |
| Net Winter Capacity (MW) | 6.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 5 |
| Operating Year | 1917 |
| Status | (OP) Operating |
| Planned Uprate Year | 2033 |
| Planned Uprate Month | 12 |
| Planned Uprate of Summer Capacity (MW) | 1.5 |
| Latitude | 47.593155 |
| Longitude | -115.3582 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3351 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3345
Sources EV-a966359a09c2152072ad638eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7fc21d221d8166e77b0aedf28e351ba5240d4831130020e8e344efba6ac56dd2
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3351
Sources EV-cd9da3d54894bccc65acbbccEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2de156da1bf99e897fd1a19b5fc8e2d1e03283f3c3960fa9f0c593c0975eb1ff
Usage terms US government public domain
