POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Thompson Falls / TF2 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc Net Summer Capacity (MW) 6.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc Net Winter Capacity (MW) 6.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc Planned Uprate of Summer Capacity (MW) 1.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-cd9da3d54894bccc65acbbcc
Detailed source fields Original source field Published value or condition Entity ID 13902 Entity Name NorthWestern Energy (MT Hydro) Plant ID 2195 Plant Name Thompson Falls Google Map Map Bing Map Map Plant State MT County Sanders Balancing Authority Code NWMT Sector Electric Utility Generator ID TF2 Nameplate Capacity (MW) 7 Net Summer Capacity (MW) 6.5 Net Winter Capacity (MW) 6.5 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 5 Operating Year 1917 Status (OP) Operating Planned Uprate Year 2033 Planned Uprate Month 12 Planned Uprate of Summer Capacity (MW) 1.5 Latitude 47.593155 Longitude -115.3582 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:3351
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3345
Sources EV-a966359a09c2152072ad638e Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 7fc21d221d8166e77b0aedf28e351ba5240d4831130020e8e344efba6ac56dd2 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3351
Sources EV-cd9da3d54894bccc65acbbcc Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 2de156da1bf99e897fd1a19b5fc8e2d1e03283f3c3960fa9f0c593c0975eb1ff Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Thompson Falls / TF2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 13902 Entity Name NorthWestern Energy (MT Hydro) Plant ID 2195 Plant Name Thompson Falls Google Map Map Bing Map Map Plant State MT County Sanders Balancing Authority Code NWMT Sector Electric Utility Generator ID TF2 Nameplate Capacity (MW) 7 Net Summer Capacity (MW) 6.5 Net Winter Capacity (MW) 6.5 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 5 Operating Year 1917 Status (OP) Operating Planned Uprate Year 2033 Planned Uprate Month 12 Planned Uprate of Summer Capacity (MW) 1.5 Latitude 47.593155 Longitude -115.3582 Original text (OP) Operating source_record_id Operating:3351
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3351
Sources EV-cd9da3d54894bccc65acbbcc Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 2de156da1bf99e897fd1a19b5fc8e2d1e03283f3c3960fa9f0c593c0975eb1ff Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Thompson Falls / TF2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 13902 Utility Name NorthWestern Energy (MT Hydro) Plant Code 2195 Plant Name Thompson Falls State MT County Sanders Generator ID TF2 Technology Conventional Hydroelectric Prime Mover HY Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X RTO/ISO LMP Node Designation NA RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERC NA Nameplate Capacity (MW) 7 Nameplate Power Factor 0.8 Summer Capacity (MW) 6.5 Winter Capacity (MW) 6.5 Minimum Load (MW) 1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 5 Operating Year 1917 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Solid Fuel Gasification System? N Carbon Capture Technology? N Time from Cold Shutdown to Full Load 10M Planned Net Summer Capacity Uprate (MW) 1.5 Planned Net Winter Capacity Uprate (MW) 1.5 Planned Uprate Month 12 Planned Uprate Year 2033 Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:3345
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3345
Sources EV-a966359a09c2152072ad638e Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 7fc21d221d8166e77b0aedf28e351ba5240d4831130020e8e344efba6ac56dd2 Usage terms US government public domain