United States of America · Generator · plant location

Carrollton / 4

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Carrollton Board of Public Wks
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
39.3515, -93.5016

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Carrollton / 4

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-8efc3b1df0370e95324e3a04
Net Summer Capacity (MW)0.7 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-8efc3b1df0370e95324e3a04
Net Winter Capacity (MW)0.7 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-8efc3b1df0370e95324e3a04
Detailed source fields
Original source fieldPublished value or condition
Entity ID3082
Entity NameCarrollton Board of Public Wks
Plant ID2120
Plant NameCarrollton
Google MapMap
Bing MapMap
Plant StateMO
CountyCarroll
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID4
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.7
Net Winter Capacity (MW)0.7
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Operating Month88
Operating Year1963
Retirement Month7
Retirement Year2005
Latitude39.3515
Longitude-93.5016
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:6435

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1488

Sources EV-256a03dfb45a95d8f1040973
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fd38d3f74e7b6f61892cbed7f06f9ae36e34cdca0a77cce0308accb615007d65

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:6435

Sources EV-8efc3b1df0370e95324e3a04
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fe1925830fb33f0138181554fdeb69fd88c599e7453deb78ceae44ad75026b5b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel