Carrollton / 10
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 6.1 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4994e3ecd207cf1bbf83cf18 |
| Net Summer Capacity (MW) | 6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4994e3ecd207cf1bbf83cf18 |
| Net Winter Capacity (MW) | 6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4994e3ecd207cf1bbf83cf18 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3082 |
| Entity Name | Carrollton Board of Public Wks |
| Plant ID | 2120 |
| Plant Name | Carrollton |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MO |
| County | Carroll |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | 10 |
| Nameplate Capacity (MW) | 6.1 |
| Net Summer Capacity (MW) | 6 |
| Net Winter Capacity (MW) | 6 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Operating Month | 9 |
| Operating Year | 1972 |
| Status | (OP) Operating |
| Latitude | 39.3515 |
| Longitude | -93.5016 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3192 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3186
Sources EV-60c1df963406cba05f996efcEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 79f325d5b49ac71f6a8332e1a4f4d3569320f4a167d20371e0e56ec570e83dc9
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3192
Sources EV-4994e3ecd207cf1bbf83cf18Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a1ade2b5c1a2206cf68dd08cc82d7538b9a8aa4da51f2018d321d3a9559ca167
Usage terms US government public domain
