Cambridge CT Hybrid / BA1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f878b3b0e28d1e74861d9b97 |
| Net Summer Capacity (MW) | 0.8 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f878b3b0e28d1e74861d9b97 |
| Net Winter Capacity (MW) | 0.8 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f878b3b0e28d1e74861d9b97 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 7570 |
| Entity Name | Great River Energy |
| Plant ID | 2038 |
| Plant Name | Cambridge CT Hybrid |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Isanti |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | BA1 |
| Nameplate Capacity (MW) | 1 |
| Net Summer Capacity (MW) | 0.8 |
| Net Winter Capacity (MW) | 0.8 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 45.601 |
| Longitude | -93.2081 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1168 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:43
Sources EV-43af015160a662c559bd7b48Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b0e5ffbde32676b036522a745ea83e01b349814756051b7f7be91843de054731
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1168
Sources EV-f878b3b0e28d1e74861d9b97Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4380b8d19a5657b71815888bb21ffc0451150bea45fa386c1829ba7190408ec5
Usage terms US government public domain