Power assets and projects · USA · eia860m

Cambridge CT Hybrid / BA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-f878b3b0e28d1e74861d9b97
Net Summer Capacity (MW)0.8 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-f878b3b0e28d1e74861d9b97
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-f878b3b0e28d1e74861d9b97
Detailed source fields
Original source fieldPublished value or condition
Entity ID7570
Entity NameGreat River Energy
Plant ID2038
Plant NameCambridge CT Hybrid
Google MapMap
Bing MapMap
Plant StateMN
CountyIsanti
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBA1
Nameplate Capacity (MW)1
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.601
Longitude-93.2081
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1168

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:43

Sources EV-43af015160a662c559bd7b48
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b0e5ffbde32676b036522a745ea83e01b349814756051b7f7be91843de054731

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1168

Sources EV-f878b3b0e28d1e74861d9b97
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4380b8d19a5657b71815888bb21ffc0451150bea45fa386c1829ba7190408ec5

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cambridge CT Hybrid / BA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7570
Entity NameGreat River Energy
Plant ID2038
Plant NameCambridge CT Hybrid
Google MapMap
Bing MapMap
Plant StateMN
CountyIsanti
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBA1
Nameplate Capacity (MW)1
Net Summer Capacity (MW)0.8
Net Winter Capacity (MW)0.8
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.601
Longitude-93.2081
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1168

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1168

Sources EV-f878b3b0e28d1e74861d9b97
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4380b8d19a5657b71815888bb21ffc0451150bea45fa386c1829ba7190408ec5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cambridge CT Hybrid / BA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7570
Utility NameGreat River Energy
Plant Code2038
Plant NameCambridge CT Hybrid
StateMN
CountyIsanti
Generator IDBA1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Summer Capacity (MW)0.8
Winter Capacity (MW)0.8
StatusU
Effective Month9
Effective Year2023
Current Month12
Current Year2026
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:43

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:43

Sources EV-43af015160a662c559bd7b48
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b0e5ffbde32676b036522a745ea83e01b349814756051b7f7be91843de054731

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel