Blyth BESS
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW DC) | 3.13 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 |
| Unit Capacity (MW AC) | 3.13 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 |
| Aggregated Nameplate Capacity (MW DC) | 200.32 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 |
| Aggregated Nameplate Capacity (MW AC) | 200.32 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 |
| Agg Nameplate Storage Capacity (MWh) | 400 MWh | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-fd54bf0cfbb1e8431a7831e7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 2248 |
| Site Name | Blyth BESS |
| KCI Id | S00021 |
| Site Owner | Blyth Battery P/L as trustee for Blyth Battery Trust |
| Region | SA1 |
| Max Site Capacity (AC) | 200 |
| Gen Info Unit ID | 224801 |
| Unit Name | BLYTHWBT |
| Technology Type | Battery Storage |
| Technology Detail | Lithium-ion |
| DUID | BLYTHB1 |
| Dispatch Type | Scheduled |
| Unit Count | 64 |
| Unit Capacity (MW DC) | 3.13 |
| Unit Capacity (MW AC) | 3.13 |
| Aggregated Nameplate Capacity (MW DC) | 200.32 |
| Aggregated Nameplate Capacity (MW AC) | 200.32 |
| Agg Nameplate Storage Capacity (MWh) | 400 |
| Commitment Status | In Service |
| Expected Closure Year | 2044 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-03-30T15:25:13 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | In Service |
| source_record_id | Generator Information:130 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:130
Sources EV-fd54bf0cfbb1e8431a7831e7Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105
Usage terms AEMO general copyright permission subject to exceptions
Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:56
Sources EV-98f0198bcc6a1ec0c3c5ae9aEvidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 6e02cb71e8ffcd7f6026562906690932cb6da14e9dc8e237bb2d27363ee6ecc7
Usage terms AEMO general copyright permission subject to exceptions
