Australia · Generator · plant location

Blyth BESS

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Blyth BESS

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)3.13 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fd54bf0cfbb1e8431a7831e7
Unit Capacity (MW AC)3.13 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fd54bf0cfbb1e8431a7831e7
Aggregated Nameplate Capacity (MW DC)200.32 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fd54bf0cfbb1e8431a7831e7
Aggregated Nameplate Capacity (MW AC)200.32 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fd54bf0cfbb1e8431a7831e7
Agg Nameplate Storage Capacity (MWh)400 MWhOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fd54bf0cfbb1e8431a7831e7
Detailed source fields
Original source fieldPublished value or condition
Survey ID2248
Site NameBlyth BESS
KCI IdS00021
Site OwnerBlyth Battery P/L as trustee for Blyth Battery Trust
RegionSA1
Max Site Capacity (AC)200
Gen Info Unit ID224801
Unit NameBLYTHWBT
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDBLYTHB1
Dispatch TypeScheduled
Unit Count64
Unit Capacity (MW DC)3.13
Unit Capacity (MW AC)3.13
Aggregated Nameplate Capacity (MW DC)200.32
Aggregated Nameplate Capacity (MW AC)200.32
Agg Nameplate Storage Capacity (MWh)400
Commitment StatusIn Service
Expected Closure Year2044
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-03-30T15:25:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:130

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:130

Sources EV-fd54bf0cfbb1e8431a7831e7
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 31fe3e9a17f95d1e66a01415d1ecfce315a6f61ef4359f292259fdf86d33b105

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:56

Sources EV-98f0198bcc6a1ec0c3c5ae9a
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 6e02cb71e8ffcd7f6026562906690932cb6da14e9dc8e237bb2d27363ee6ecc7

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel